So at last as I sit down to write my first blog post as Course Manager of Muswell Hill Golf Club I'm struggling to remember where the last 8 weeks have gone. I had to count them a few times just to check that it was indeed 8 weeks that had passed. As the old adage goes, Time does fly when you're having fun...
I'd like to begin my first post by wishing Matt all the best with his new challenge at Stoneham Golf Club. Matt not only has been my boss for the previous seven years but also a good friend. His enthusiasm & drive for everything he did whilst at Muswell Hill have moved the golf course on to new higher standards and it is my aim to continue and raise the standards we have set for Muswell Hill Golf Club.
It is my intention to keep the blog updated with the works that are being both carried out on the course and hopefully give an insight into some of the challenges we face maintaining and improving the golf course.
So lets begin with the previous eight weeks. Hot is a word that would probably explain how things have been. Dry, arid & drought could all be used in equal measure. Some of the temperatures we have experienced have been nearly record breaking. Day highs of 38C and only 10mm of recorded rainfall have made for different challenges as we look to produce fine turf surfaces for golf to be played on.
It has been a balance of protecting the turf whilst providing surfaces which allow for good golf.
A lot of the work which we do in managing the golf course surfaces is aimed at creating conditions that allow us to push the surfaces to high performance levels whilst protecting them from the stresses that turf suffers from. So a lot of the work which we carry out, aeration, in it's many varied forms, topdressing, cutting, watering & feeding is planned with a long term strategy of producing fine turf surfaces.
This brings me onto the work we completed on the greens during maintenance week. Now this week is one of the most important in the golfing calendar for me as it allows us to really work the surfaces. It's important to carry out the work during the season as the recovery time is significantly quicker whilst the grass is still growing.
So last week we hollow cored the greens, removing a 4 inch core, we then verti-drained to a depth of 7 inches, then using a machine called the DryJect we injected nearly 30 tonnes of sand into the greens profile. This was followed up by two further top dressings. The aim of all this work is to improve the way both the soil & grass plant interact and ultimately healthier turfgrass.
|
A little explanation..... |
|
Explaining the relationship between a healtyh functioning soil & healthy turfgrass |
|
The DryJect machine |
|
Hollow coring greens |
|
Hollow core, thatch layer visible at top of core |
|
Verti-draining to help improve rooting |
|
Sand being applied to greens |
|
Filling the holes with sand helps drainage of the greens |
So as the August rains arrive, eventually, although being a Greenkeeper I'm never completely happy with the weather, it could do to stop for a couple of days so I can dress the greens again, myself and the team will continue to work hard and continue to raise standards at Muswell Hill Golf Club. It would be remiss of me not too mention the Greenkeeping team that I'm working with at the club, their dedication & professionalism both before I took over and since have been first rate and without their continued dedication, support and hard work none of the work we do would be possible.
So as we move forwards I will keep the blog updated of any works we carry out and hopefully give an insight into the wonderful world of Golf Course Management.......