Monday, 11 January 2016

The Battles Of Winter......

As we enter the New Year it is a time to turn our attention's to what lies ahead and set ourselves goals & targets to aspire too. Or if your a Greenkeeper pray to whoever that it is going to stop raining soon.
As I write the first blog post of 2016 on the 11th January, 90mm of recorded rainfall has fallen onto the golf course this year. I wont lie to you, the course is struggling to cope. Fairway drains, ditches and outlets are overflowing just with the shear volume of water that is moving across the course. This level of rain has meant some days of course closures. To have to close the golf course is one of the worst feelings for a Greenkeeper, and especially for me as course manager. It is a feeling of defeat, that there must have been something else we could have done to help drain the course quicker, in this instance we have to admit mother nature has beaten us down but not defeated us. The course closures have been implemented to help minimise course damage, it's a tough call but I don't wont to cause even more damage to the playing surfaces when we have still to enter a period of cold weather with no recovery available to the surfaces. So as I have said we have suffered, not as bad as some, but progress is being made. The greens that were drained in the autumn are performing really well and the aeration & topdressing that has been carried out is helping the water move through the soil profile's quicker so we can hopefully be open, with less damage caused, that little bit quicker. The air flow round the course has been improved with the woodland management practices that we have been carrying out so that too is progress. The recent wet period has again highlighted areas that we need to tackle with more drainage. And that is what we must continue to do, install more drainage and provide playing surfaces that are able to drain quicker. So the greenstaff will be out repairing pathways, bunkers and general damage caused by the weather, but hopefully you will be able to see all this work going on because the golf course will be open.....











 

Wednesday, 9 December 2015

Can't see the wood' for the tree's.....

I'd like to post some information about the recent tree planting exercise that has been undertaken on the 3rd hole this week. Firstly the reasons why? This summer we have been faced with some issues of errant tee shots entering neighbouring properties on the 3rd hole. After consultation with a  Health & Safety expert, a golf course architect & members of the greens committee a number of measures have been introduced to try & help reduce & minimise the risk that these errant shots may cause.
One of the proposals was to plant more trees on the left of the hole. The thinking behind this was to try and influence the tee shot that people play off the tee. By making the left side of the hole less appealing to golfers, we can try and reduce the number of incidents of balls entering properties and potentially causing damage. Alongside the new planting we will also be removing some old silver birch tree's down the right hand side of the hole to give golfers more confidence of playing down the right. Now of course nothing can stop a bad shot, and the likelihood of balls still entering properties' remain high, due to the close proximity of the properties to the golf hole, but the club has to be seen to act in a reasonable manner and we have a duty of care not only to our neighbours but also to the members and golfers of Muswell Hill Golf Club. To not act on the incidents could ultimately end with a dramatic redesign of the golf hole with it's length being reduced.





So to the tree's that have been planted. Working with tree expert John Nicholson a selection of pines, oaks, birch and lime have been planted. Over 200 tree saplings were planted. The reason for choosing these tress was to give us the evergreen coverage with the pine, to help with some quick growing species the lime and birch and to ultimately have some oak as final specimen tree's.
One of the most important factors to remember about new plantings is that some of these tree's, potentially up to 70% of the ones planted, will be removed in time as the tree's mature and develop. This style of woodland management will give the golf course a continuous coverage of different age species and ultimately lead to the establishment of trees that will last for well over 150 years.





The work to thin out copses all across the golf course will begin, with the long term aims of providing better trees on the golf course in terms of golf strategy, tree health and preserving and enhancing environmental and wildlife habitats.      

Saturday, 5 December 2015

Where's the winter?

Normally by this time of year on the golf course the mowers would be taking a well earned rest whilst we would be hard at work on our winter project's. But this year the slow down in grass growth hasn't happened yet, and although it's been very windy of late, Storm Desmond the  current 'named' force of nature to batter down on us, temperatures have been regularly above 10 degrees which means continued grass growth. A long side the wet weather we've been experiencing has made presenting the course that little bit more challenging. We've been using the handmowers a lot more, less traffic across the golf course & the cutting heights have been raised to help protect the plant going into winter. It's very important we keep the plant 'green & healthy' as environmental stress, low temperatures, reduced sunlight, increased rainfall can all lead to a weakened grass sward and at this time of year recovery is minimal. Having a healthier plant coming into the spring will give us the best possible start for next year's golfing season.
We've started some of our winter maintenance programmes, the first of the paths have been added to the 2nd, 7th & 17th and some tree work has begun around the course. Drainage has also been installed into the problem wet area in between the 16th bunkers on the right hand side of the green.
This work will carry on through the winter as will  the course presentation but with course protection a major factor in all the work we do.
Enjoy your golf. 

Friday, 20 November 2015

Back on the Greens

As I write this next chapter of the blog I'm  pleasently pleased to hopefully see a frost forming outside, I'll explain more shortly, and the fact we have been able to get 4 of the greens we drained back in play today.
The greens drainage project was completed in 15 working days with the greenstaff putting in over 930 man hours, a highly commendable effort.
Since we finished the drainage works on the greens four weeks have passed, four weeks of seasonally unwarm & wet weather that have been perfect for the greens recovery but have also been a perfect breeding ground for fungal turf disease & and meant we've had to try & catch up on the course presentation while trying to prepare the course for the onslaught of Winter. The initial period of recovery was to let the greens rest after all the work that had gone on. Then came a micro management program of liquid feeding, cutting & rolling.
The greens were handcut & rolled to help the drain lines settle in, some localised lifting will be required and works will need to be carried out in terms of topdressing & hollow coring but the greens have settled down really well. One of the most challenging aspects of the recovery was to provide an environment we're the grass plant was able to produce root's that would allow the turf to knit together & begin to take in nutrients. This was achieved by carefully managing the height of cut, when was constructive to roll and a balanced nutrient program.
We were also helped by mother nature. So thank you mother nature.
Once the final turfs were layed on the 18th green we could turn our attention to maintaining & presenting the golf  course. The warm weather that was proving so beneficial to the recovery of the drained greens meant other areas of the  course
still required cutting several times a week. And there was the small matter of the annual autumn leaf fall event that proves ever challenging. But the greenstaff have taken all this in their stride, and hopefully not too many balls were lost..!!!!
As I mentioned earlier hopefully the first signs of frost this winter will single a slow down  in growth so we can concentrate our efforts on  tidying up the  course and beginning our winter maintenance programmes.
I'd like to thank the membership for their understanding whilst we carried out the drainage works. The benefits will be there with drier putting surfaces that will enable us to produce better, more consistent surfaces throughout the year.
And as you may have noticed, all the recent rain has provided a good early test to see how the greens perform with the drainage installed, and the good news is all the outlets were flowing with water taken from the greens.
Enjoy your golf & good luck to the incoming captain's of Muswell Hill Golf Club.

Thursday, 22 October 2015

Greens Drainage continued

So as the second week has passed and we just enter the third week of the drainage works here's an update on our progress.
The undertaking of draining 6 green's in a 3 week period was always going to be a monumental task both in terms of the effort, skill & dedication required to complete the task. And it is a great pleasure for me to say the effort from the member's of the greenstaff & the contractor's from Profusion have helped make this project such a success.

After our initial delays in week 1 due to the bad weather we made considerable gains in week 2. Starting the second week we had begun work on the 12th & 14th green's. By the end of the week we had finished 3 greens and had trenches dug, piped & stoned on the 11th. This has been a great effort and lots of long hour's. But the dedication shown by the lads has been a credit to themselves & the golf club.

The process of works has seen the contractor's move ahead onto a green using lasers to determine the gradient and work out where to place the drains.
The next step in the process is to cut the turf to a 1 inch depth, then roll them up and number them so they can go back in the correct order. The contractor's then begin trenching and removing the spoil. As the works progress the pipe and stone is then added followed by the rootzone. The rootzone is then compacted every 100mm to prevent the drain lines sinking. This is an important part of the process as one of the overwhelming factors about the whole project is to be able to return the greens surface back to a playing surface. After the rootzone is levelled off the turf is then put back. This is a case of almost jigsaw like puzzles as the turfs are layed. Once the turf is layed back down it is then a process of rolling, top dressing & light feeding to get the turfs to knit in and be ready for play again.

So as we progress on with the works on the 18th green I'd like to thank all the members at the golf club for their patience whilst we carry out these work's and say a big thank you to the member's of the greenstaff team.

All these work's will only improve the surfaces at Muswell Hill Golf Club and that is something we are all committed to.

Thanks & enjoy your golf.

Wednesday, 7 October 2015

Greens Drainage Week 1

Winter Projects are both an exciting and nervous time for the Greenstaff at the golf course. Exciting as Course developments & improvements are something to be proud of and the prospect of 'getting stuck' into the work means long but rewarding days & nervous as at more than ever do we check our weather forecast to see what is forecast and what mother nature will throw at us.
This Winter we are undertaking the drainage of 6 green's across the golf course. Greens 4,11, 12, 13, 14 & 18 will have pipe drainage & rootzone added.
The main reason for the drainage work is to help get water through the soil profile. Being on heavy clay soil after any significant rain events the soil profile quickly fills up with water and becomes saturated. This renders the greens surface unplayable & also has limiting effects on the root development and health of the grass plant.

After a week's delay the greens drainage works got underway this Monday with the contractor's arriving on site. The contractor's bring with them specialised machinery & expertise, coupled with the greenstaff previous drainage experience & enthusiasm which will lead to these work's being completed and the Green's back in play as soon as possible.

We started the drainage works on the 12th green. The first task is to cut the turf, which is then lifted & numbered so it can go back in the same position. Kind of like a big turf jigsaw.  All the greens will have drains installed at 3 metre spacings across the surface with the greens surface surveyed  to find the natural fall of the land and the drains installed to fit this profile.

The works this week has seen us trench & install pipe, stone & rootzone on the 12th & trenching work with pipe & stone installed the 14th.
We've also managed to get some turf back down on the 12th & water has been running out of the drains allready. That was a truly great sight to see the drains working & drawing water through the profile.

This has been a really good effort by the lads after the rain earlier in the week meant we couldn't get going until Wednesday afternoon. We worked until dark, can't beat trenching in the dark, to try and make up some of the time we lost.

The weather forecast looks fair for next week so more of the same will be required for us to complete the works.

Again thanks for your understanding whilst we carry out these work's. Drier surfaces will follow.....